浙江樂清市區(qū)污水處理工程

時(shí)間:2006-09-05 16:00

來源:溫州市發(fā)展和改革委員會(huì)

評(píng)論(

  一、項(xiàng)目編號(hào):43

  二、項(xiàng)目所屬地區(qū):樂清市

  三、項(xiàng)目名稱:樂清市區(qū)污水處理工程

  四、項(xiàng)目所屬行業(yè):環(huán)保

  五、建設(shè)性質(zhì):新建

  六、項(xiàng)目背景及建設(shè)條件:

  樂清市市區(qū)污水處理工程是提升城市品位、凈化生活環(huán)境的基礎(chǔ)設(shè)施,工程的建設(shè)對(duì)于促進(jìn)樂清經(jīng)濟(jì)、環(huán)境協(xié)調(diào)發(fā)展,加快城市化進(jìn)程具有十分重要的意義。工程服務(wù)范圍包括樂成鎮(zhèn)在內(nèi)的十個(gè)城鎮(zhèn),遠(yuǎn)期城區(qū)人口85萬,服務(wù)區(qū)面積83.8平方公里,預(yù)計(jì)近期產(chǎn)污量14.14萬立方米/天,遠(yuǎn)期44萬立方米/天。

  七、項(xiàng)目準(zhǔn)備或進(jìn)展情況:

  已完成初步設(shè)計(jì)、污水處理廠征地工作,完成9公里污水總干管的埋設(shè)。

  八、項(xiàng)目建設(shè)規(guī)模和內(nèi)容:

  該工程設(shè)計(jì)規(guī)模為16萬噸/日,一期先實(shí)施4萬噸/日污水處理廠(1.15億元)、43公里污水輸送總干管道(1.6億元)、7座輸送泵站(0.53億元);污水處理廠部分土建按16萬噸/日設(shè)計(jì)和實(shí)施。

  九、財(cái)務(wù)評(píng)價(jià):一期工程總投資3.3億元,投資回收期12年。

  十、合作方式和內(nèi)容:合資或獨(dú)資

  十一、項(xiàng)目方可提供的合作條件:

  《樂清市市區(qū)污水處理工程初步設(shè)計(jì)》等。

  十二、項(xiàng)目聯(lián)系方式:

  聯(lián)系單位:樂清市市政園林局

  聯(lián)系地址:樂清市樂成鎮(zhèn)建設(shè)中路9號(hào)

  聯(lián) 系 人:楊曉東

  電 話:0577-62523726

  傳 真:0577-62522135

  郵 編:325600

  電子郵箱:majf@mail.wzptt.zj.cn

  1. Project No: 43

  2. Location: Yueqing City

  3. Name: Yueqing Urban Sewage Treatment Plant

  4. Category: Environmental Protection

  5. Nature: New

  6. Background and Construction Condition:

  Yueqing Urban Sewage Treatment Plant is an infrastructure project for purifying living environment and upgrading the city. The construction of the project is of great significance to the promotion of economic growth, coordinated development of environment and acceleration of urbanization of the city. The project, covering ten towns (inclusive of Yuecheng Town) with an area of 83.8 sq.km and the urban population of 850 thousand, is estimated to have a capacity of 141.4 thousand m3 /d at the early stage and a capacity of 440 thousand m3 /d at the later stage.

  7. Progress of the Preparatory Work:

  Land requisition and preliminary designing are completed. The main pipe of 9 km has been laid.

  8. Construction Scale and Target:

  The capacity of the project is designed to be 160 thousand TPD. The 1st phase is composed of a 40-thousand-TPD sewage treatment plant (115 million yuan), a trunk conveying pipeline of 43 km (160 million yuan) and 7 conveying pump station (53 million yuan). Part of the land construction will be designed by the scale of 160 thousand TPD.

  9. Financial Estimation:

  The total investment of the 1st phase is 330 million yuan and the period for investment recovery is 12 years.

  10. Cooperation Form and Content: Joint venture or sole proprietorship

  11. Conditions Provided by the Project Sponsor: Preliminary Design of Yueqing Urban Sewage Treatment Project, etc.

  12. Sponsor Unit: Yueqing Municipal Gardening Bureau

  Add: 9 Jianshe Central Rd., Yuecheng Town, Yueqing City

  Person to Contact Yang Xiaodong

  Tel:0577-62523726

  Fax: 0577-62522135

  Postcode: 325600

  E-mail: majf@mail.wzptt.zj.cn

編輯:全新麗

  • 微信
  • QQ
  • 騰訊微博
  • 新浪微博

相關(guān)新聞

網(wǎng)友評(píng)論 人參與 | 條評(píng)論

版權(quán)聲明: 凡注明來源為“中國水網(wǎng)/中國固廢網(wǎng)/中國大氣網(wǎng)“的所有內(nèi)容,包括但不限于文字、圖表、音頻視頻等,版權(quán)均屬E20環(huán)境平臺(tái)所有,如有轉(zhuǎn)載,請(qǐng)注明來源和作者。E20環(huán)境平臺(tái)保留責(zé)任追究的權(quán)利。
媒體合作請(qǐng)聯(lián)系:李女士 010-88480317

010-88480329

news@e20.com.cn

Copyright ? 2000-2020 http://www.wxjxgy.cn All rights reserved.

中國水網(wǎng) 版權(quán)所有